Vertex Lightning Protection designs, installs, tests and maintains lightning protection systems for commercial, industrial, educational, historic and public sector buildings throughout the UK.
Our projects incorporate building-specific lightning risk assessments, air termination networks, down conductors, earth termination systems and surge protection measures designed around applicable BS EN 62305 requirements.
Project: Commercial lightning protection system installation
Customer: Jonathan Heswall
Company: Heswall Commercial Property Developments
Location: Reading, Berkshire
Number of Buildings: 5
Combined Floor Area: 52,400m²
Project Value: £118,750
Project Duration: 28 working days
Services: Commercial lightning protection, risk assessments, system design, installation and surge protection
Heswall Commercial Property Developments operated a commercial business campus incorporating five multi-storey office buildings accommodating approximately 3,400 employees.
The development incorporated extensive rooftop mechanical equipment, electrical distribution infrastructure, data communications systems and building management controls.
The customer required coordinated lightning protection installations across all five buildings to reduce exposure to structural damage, electrical equipment failure and business interruption.
Vertex Lightning Protection conducted individual risk assessments for each building in accordance with BS EN 62305-2.
The assessments considered:
Building height and structural dimensions
Geographical lightning exposure
Roofing and façade materials
Occupancy levels
Rooftop mechanical equipment
Incoming electrical and telecommunications services
Potential business interruption
Existing earthing infrastructure
The findings established the protection measures required for each building.
Individual lightning protection designs were developed around the structural characteristics of each office building.
The designs incorporated roof-level air termination networks, elevated air terminals, down conductor routes and earth termination arrangements.
Rooftop mechanical equipment was assessed to establish appropriate protection coverage, separation distances and bonding requirements.
The combined installation programme incorporated:
Approximately 2,850 linear metres of lightning protection conductor
64 air termination rods
48 down conductor routes
56 earth electrodes
48 accessible test connections
Equipotential bonding connections
Coordinated surge protection devices
Dedicated conductor fixings and supports
Conductor materials and fixing systems were selected according to roof construction, environmental exposure and architectural requirements.
Vertex Lightning Protection installed coordinated surge protection devices at selected electrical distribution points across the business campus.
The protection arrangements addressed transient overvoltages affecting building management systems, communications equipment, office electrical infrastructure and security installations.
The installation programme was divided into five individual building phases.
Roof access, external excavation and electrical isolation were coordinated with facilities managers to minimise disruption to occupied office accommodation.
Each completed lightning protection system underwent visual inspections, electrical continuity testing and earth resistance measurements.
The customer received individual installation drawings, commissioning records and recommended future inspection schedules.
Heswall Commercial Property Developments received coordinated lightning protection arrangements across its five commercial office buildings.
The completed project delivered:
Lightning protection across 52,400m² of commercial accommodation
Five building-specific protection systems
Coordinated earthing and bonding infrastructure
Surge protection for selected electrical installations
Individual testing and commissioning records
Centralised system documentation
The installation programme was completed within twenty-eight working days and the agreed £118,750 budget.
Project Takeaway: Commercial lightning protection reduces exposure to structural and electrical damage because coordinated external protection, earthing and surge protection manage different lightning-related risks.
Project: Historic church lightning protection refurbishment
Customer: Reverend Peter Aldwick
Organisation: Somerset Parish Buildings Partnership
Location: Wells, Frome and Glastonbury
Number of Churches: 3
Church Tower Heights: Between 24 and 38 metres
Project Value: £57,600
Project Duration: 24 working days
Services: Church lightning protection, system refurbishment, conductor replacement, earthing and testing
Somerset Parish Buildings Partnership managed three historic churches incorporating traditional stone construction, elevated bell towers, decorative masonry and stained glass windows.
Previous inspections identified deteriorated lightning protection conductors, damaged fixings and ageing earth termination arrangements.
The customer required refurbishment works that addressed the identified defects without compromising the historic appearance or architectural significance of the buildings.
Vertex Lightning Protection inspected the existing protection systems across all three churches.
The assessment programme considered:
Church tower heights
Roof and spire construction
Historic masonry
Existing conductor routes
Condition of air termination components
Bell tower electrical installations
Earth electrode condition
Conservation requirements
Existing protection arrangements were reviewed against the relevant system design and applicable lightning protection requirements.
Replacement conductor routes followed existing architectural features wherever practicable.
The installation designs incorporated discreet conductor positioning and suitable fixing methods to minimise alterations to historic building materials.
Proposed works were coordinated with conservation representatives, with relevant permissions addressed before installation commenced.
The combined refurbishment programme incorporated:
Approximately 480 linear metres of copper conductor
10 replacement air termination rods
12 down conductor routes
18 earth electrodes
12 accessible test connections
Replacement conductor fixings
Renewed bonding connections
Selected surge protection upgrades
Suitable existing components were retained where their condition and performance could be established.
The installation teams used appropriate scaffolding and elevated access equipment to reach church towers and roof structures.
Work programmes were coordinated around religious services, weddings, funerals and community activities.
Temporary working areas protected visitors and members of the public during installation.
Existing earth electrode arrangements were assessed before replacement or supplementary electrodes were installed.
New earth termination components were positioned according to the system design, available ground conditions and restrictions associated with historic church grounds.
Accessible test connections were provided to facilitate future inspections.
Following refurbishment, each church received:
Visual lightning protection inspections
Electrical continuity testing
Earth resistance measurements
Bonding connection inspections
Updated system drawings
Individual inspection reports
Somerset Parish Buildings Partnership received refurbished lightning protection systems across all three historic churches.
The completed programme delivered:
Replacement of deteriorated lightning protection components
Renewed copper conductor networks
Improved earth termination arrangements
Discreet installation routes
Updated inspection and testing documentation
Protection measures appropriate to each historic building
The refurbishment programme was completed within twenty-four working days and the agreed £57,600 budget.
Project Takeaway: Historic church lightning protection requires building-specific installation methods because conservation restrictions and traditional construction materials influence conductor positioning, fixings and earth termination arrangements.
Project: Multi-site school lightning protection installation and refurbishment
Customer: Alison Thackray
Organisation: Yorkshire Learning Estates Partnership
Location: Leeds, Bradford, Harrogate, Wakefield and York
Number of Schools: 12
Combined Building Floor Area: 58,200m²
Number of Pupils: Approximately 8,400
Project Value: £186,400
Project Duration: 35 working days
Services: School lightning protection, lightning risk assessments, system installations, refurbishment and testing
Yorkshire Learning Estates Partnership managed twelve primary and secondary schools incorporating teaching buildings, science laboratories, sports halls, administrative accommodation and specialist learning facilities.
Several schools had undergone extensions and roof refurbishments, requiring reviews of existing lightning protection arrangements.
Other schools required new protection systems following updated risk assessments.
The customer required a coordinated installation programme during the summer school holidays.
Vertex Lightning Protection conducted individual lightning risk assessments across all twelve educational sites.
The assessments considered:
Building dimensions and occupancy
Existing lightning protection installations
School extensions and additional buildings
Roof construction
Electrical distribution systems
Information technology infrastructure
Rooftop mechanical equipment
Potential consequences of lightning-related damage
Existing earthing arrangements
The assessment programme identified five schools requiring new lightning protection systems and seven requiring upgrades or refurbishment.
The combined installation programme incorporated:
Approximately 4,100 linear metres of lightning protection conductor
86 air termination rods
72 down conductor routes
84 earth electrodes
72 accessible test connections
Replacement conductor supports and fixings
Equipotential bonding connections
Coordinated surge protection installations
Individual protection arrangements reflected the requirements established through each school's risk assessment and system design.
Surge protection arrangements were assessed across the educational estate.
Selected installations incorporated coordinated protection measures for electrical distribution infrastructure serving computer suites, science laboratories, communications systems and interactive classroom equipment.
Vertex Lightning Protection deployed multiple installation teams across the twelve school sites.
The individual work programmes coordinated:
Roof-level conductor installations
Down conductor installation
Earth electrode installation
External excavation
Electrical distribution works
System inspection and testing
Installation activities were coordinated with school estates managers and other refurbishment contractors.
Following installation, each school received individual inspection and commissioning documentation covering:
Air termination system inspections
Down conductor continuity measurements
Earth resistance measurements
Bonding connection inspections
Installation drawings
Details of completed remedial works
Recommended inspection intervals
Yorkshire Learning Estates Partnership received upgraded lightning protection arrangements across twelve educational sites.
The completed programme delivered:
Twelve individual lightning risk assessments
Five new lightning protection installations
Seven existing system refurbishments
Upgraded earthing and bonding infrastructure
Individual school testing records
Centralised lightning protection documentation
Completion before pupils returned for the autumn term
The programme was completed within thirty-five working days and the agreed £186,400 budget.
Project Takeaway: Coordinated school lightning protection programmes support educational estates management because individual assessments establish building-specific requirements while centralised documentation simplifies future inspections and maintenance.
Project: Industrial lightning protection and earthing installation
Customer: Malcolm Sherratt
Company: Sherratt Advanced Manufacturing
Location: Coventry, West Midlands
Number of Industrial Buildings: 4
Combined Floor Area: 64,800m²
Project Value: £132,800
Project Duration: 30 working days
Services: Industrial lightning protection, risk assessments, earthing systems, surge protection and commissioning
Sherratt Advanced Manufacturing operated four industrial buildings incorporating automated production lines, robotic assembly equipment, precision manufacturing machinery and electrical control systems.
The manufacturing campus had undergone significant expansion, introducing additional production facilities and upgraded electrical infrastructure.
The customer required coordinated lightning protection arrangements across the expanded industrial estate to reduce exposure to equipment damage and production disruption.
Vertex Lightning Protection assessed each manufacturing building individually.
The assessment programme considered:
Industrial building dimensions
Structural steelwork
Roofing materials
Roof-mounted extraction and ventilation equipment
Electrical distribution infrastructure
Automated manufacturing equipment
Incoming power and communications services
Existing earthing and bonding arrangements
Potential production interruptions
The findings informed the lightning protection designs for each building.
Soil resistivity measurements were undertaken at selected locations across the manufacturing campus.
The results supported the design of earth termination arrangements appropriate to the ground conditions and existing site infrastructure.
The earthing designs incorporated suitable electrode configurations, buried conductors and bonding connections.
The combined installation programme incorporated:
Approximately 3,600 linear metres of roof-level conductors
76 air termination rods
58 down conductor routes
68 earth electrodes
Approximately 1,120 linear metres of buried earthing conductor
58 accessible test connections
Equipotential bonding connections
Coordinated surge protection devices
The installation designs accounted for rooftop extraction equipment, structural steelwork and existing electrical infrastructure.
Coordinated surge protection devices were installed at selected points within the electrical distribution infrastructure.
The protection measures addressed transient overvoltages affecting equipment supplied by the relevant distribution systems, including production controls, communications infrastructure and industrial machinery.
Device selection and installation reflected the electrical characteristics of each building.
The manufacturing campus remained operational throughout most of the installation programme.
Vertex Lightning Protection divided the works into individual building phases and coordinated electrical isolations with the customer's engineering team.
Selected works were completed during planned machinery maintenance periods.
The completed installations underwent:
Visual inspections
Electrical continuity measurements
Earth resistance testing
Bonding connection verification
Inspection against the agreed installation designs
Surge protection installation checks
Individual commissioning records were produced for each manufacturing building.
Sherratt Advanced Manufacturing received coordinated lightning protection installations across its four industrial buildings.
The completed project delivered:
Lightning protection across 64,800m² of manufacturing accommodation
Building-specific air termination systems
Coordinated earth termination networks
Upgraded equipotential bonding arrangements
Surge protection for selected electrical installations
Individual testing and commissioning records
Centralised industrial protection documentation
The installation programme was completed within thirty working days and the agreed £132,800 budget.
Project Takeaway: Industrial lightning protection supports manufacturing continuity because coordinated external protection, earthing and surge protection reduce exposure to lightning-related structural and electrical damage.
Project: Multi-site lightning protection inspection and risk assessment programme
Customer: Rebecca Millward
Organisation: South West Public Estates Partnership
Location: Bristol, Bath, Exeter, Taunton, Plymouth and Cheltenham
Number of Buildings: 32
Combined Floor Area: 146,800m²
Project Value: £28,800
Average Assessment and Inspection Cost: £900 per building
Project Duration: 30 working days
Services: Lightning risk assessments, lightning protection testing, system inspections and condition reporting
South West Public Estates Partnership managed a diverse property portfolio incorporating administrative offices, libraries, community buildings, leisure centres and public service facilities.
Existing lightning protection systems varied in condition, age and installation specification.
Several properties had undergone structural alterations since their previous assessments.
The customer required updated risk assessments and detailed inspections to establish ongoing protection requirements across the estate.
Vertex Lightning Protection coordinated assessments across:
12 administrative office buildings
8 libraries
6 community centres
4 leisure centres
2 public service facilities
Previous lightning protection reports, building drawings and maintenance records were reviewed wherever available.
Individual risk assessments considered:
Building size and structural height
Geographical lightning exposure
Construction materials
Occupancy levels
Electrical and communications infrastructure
Potential interruption to public services
Existing lightning protection arrangements
Recent building alterations
The assessment findings established whether existing protection measures required further investigation or modification.
The inspection programme examined existing:
Air termination networks
Down conductors
Conductor supports and fixings
Accessible test connections
Earth termination components
Equipotential bonding arrangements
Protection coverage around altered roof structures
Electrical continuity and earth resistance testing were completed at 416 accessible testing locations.
The completed programme established:
21 buildings with no significant defects identified within the inspection scope
8 buildings requiring minor repairs or maintenance
3 buildings requiring more extensive remedial works or protection design reviews
The inspections identified:
62 damaged or deteriorated conductor fixings
24 corroded conductor connections
14 defective test connections
9 earth termination arrangements requiring further investigation
6 rooftop alterations requiring reviews of lightning protection coverage
The findings were recorded within individual property reports.
Vertex Lightning Protection provided building-specific maintenance recommendations covering:
Replacement of damaged lightning conductors
Renewal of deteriorated connections
Replacement of defective fixings
Investigation of earth termination arrangements
Additional bonding measures where required
Protection design reviews following building alterations
Recommendations were prioritised to support the customer's maintenance budgeting and procurement arrangements.
A consolidated lightning protection register recorded each property's assessment date, system condition, identified defects and recommended maintenance requirements.
Individual risk assessment and inspection documents were supplied alongside the register.
South West Public Estates Partnership received updated lightning protection records across all thirty-two public sector buildings.
The completed programme delivered:
Thirty-two lightning risk assessment reviews
Thirty-two individual system inspections
Electrical testing across 416 accessible locations
Identification of eleven buildings requiring further works
Prioritised maintenance recommendations
Centralised lightning protection asset records
The assessment programme was completed within thirty working days and the agreed £28,800 budget.
Project Takeaway: Portfolio-wide lightning risk assessments and testing support preventative maintenance because coordinated inspection records identify deteriorated components, building alterations and protection requirements across individual properties.
Project: Nationwide lightning protection maintenance and refurbishment programme
Customer: Edward Bradfield
Company: Bradfield Hotels and Leisure Resorts
Location: Manchester, Liverpool, Chester, Bath, Cardiff, Birmingham and London
Number of Properties: 14
Combined Building Floor Area: 88,600m²
Number of Guest Rooms: 2,240
Project Value: £79,800
Project Duration: 32 working days
Services: Lightning protection maintenance, conductor repairs, earthing refurbishment, system upgrades and retesting
Bradfield Hotels and Leisure Resorts operated fourteen hospitality properties incorporating guest accommodation, restaurants, conference facilities, swimming pools and leisure amenities.
Previous lightning protection inspections identified deteriorated conductors, damaged roof-level fixings and earthing components requiring further attention.
Several hotels had also received rooftop mechanical equipment upgrades that required reviews of existing lightning protection coverage.
The customer required a coordinated maintenance programme that minimised disruption to guests and hospitality operations.
Vertex Lightning Protection reviewed previous testing records and inspected the existing systems at each property.
The inspections identified:
Damaged roof-level conductors
Corroded conductor joints
Deteriorated air termination components
Loose or damaged conductor fixings
Defective test connections
Earth electrodes requiring replacement or investigation
Roof alterations requiring protection reviews
The findings informed the individual maintenance programmes.
The combined refurbishment programme incorporated:
Replacement of approximately 1,240 linear metres of lightning protection conductor
Replacement of 34 air termination rods
Refurbishment of 42 down conductor routes
Replacement of 560 conductor fixings
Renewal of 38 accessible test connections
Replacement or supplementary installation of 30 earth electrodes
Renewal of 86 conductor and bonding connections
Suitable existing components were retained where their condition and performance could be established.
Several properties had received replacement air conditioning equipment, ventilation systems and rooftop mechanical plant.
Vertex Lightning Protection reviewed the existing protection arrangements around the altered roof configurations.
Air termination coverage, separation distances and bonding requirements were assessed and updated where required by the revised protection designs.
Selected earth termination arrangements were investigated following the review of previous electrical testing records.
Replacement or supplementary electrodes were installed according to individual site requirements.
Accessible test connections were reinstated to facilitate subsequent inspections and maintenance.
The maintenance teams coordinated activities with individual hotel managers.
External access equipment, roof works and ground-level excavations were arranged around guest occupancy, conference bookings and scheduled hospitality events.
Selected electrical works were completed during agreed maintenance windows.
Following completion, refurbished systems underwent visual inspections, electrical continuity measurements and earth resistance testing.
The updated reports documented:
Replaced lightning protection components
Revised conductor routes
Earth termination improvements
Updated electrical measurements
Remaining maintenance requirements
Recommended future inspection intervals
A consolidated asset register supported ongoing lightning protection maintenance across the hotel portfolio.
Bradfield Hotels and Leisure Resorts received refurbished lightning protection arrangements across fourteen hospitality properties.
The completed programme delivered:
Maintenance across 88,600m² of hospitality accommodation
Replacement of damaged lightning protection conductors
Refurbished air termination and down conductor systems
Improved earth termination arrangements
Revised protection around selected rooftop mechanical equipment
Updated inspection and testing records
Centralised maintenance documentation
The maintenance programme was completed within thirty-two working days and the agreed £79,800 budget.
Project Takeaway: Lightning protection maintenance preserves the intended performance of existing systems because component replacement, electrical testing and design reviews address deterioration and changes to building infrastructure.
Vertex Lightning Protection provides commercial lightning protection, school lightning protection, church lightning protection, industrial installations, lightning risk assessments, system testing, maintenance and refurbishment throughout the UK.
Our team delivers building-specific protection systems, coordinated earthing arrangements and comprehensive inspection documentation for individual buildings and nationwide property portfolios.
Contact us today to discuss your lightning protection installation, testing or maintenance requirements.
Vertex Lightning Protection is a trading style of Equiptest Limited, registered in England & Wales (company no. 06009889).