Commercial Lightning Protection Installation at a Business Campus in Reading

Project: Commercial lightning protection system installation

Customer: Jonathan Heswall

Company: Heswall Commercial Property Developments

Location: Reading, Berkshire

Number of Buildings: 5

Combined Floor Area: 52,400m²

Project Value: £118,750

Project Duration: 28 working days

Services: Commercial lightning protection, risk assessments, system design, installation and surge protection

The Customer's Requirements

Heswall Commercial Property Developments operated a commercial business campus incorporating five multi-storey office buildings accommodating approximately 3,400 employees.

The development incorporated extensive rooftop mechanical equipment, electrical distribution infrastructure, data communications systems and building management controls.

The customer required coordinated lightning protection installations across all five buildings to reduce exposure to structural damage, electrical equipment failure and business interruption.

Commercial Lightning Risk Assessments

Vertex Lightning Protection conducted individual risk assessments for each building in accordance with BS EN 62305-2.

The assessments considered:

  • Building height and structural dimensions

  • Geographical lightning exposure

  • Roofing and façade materials

  • Occupancy levels

  • Rooftop mechanical equipment

  • Incoming electrical and telecommunications services

  • Potential business interruption

  • Existing earthing infrastructure

The findings established the protection measures required for each building.

Lightning Protection System Design

Individual lightning protection designs were developed around the structural characteristics of each office building.

The designs incorporated roof-level air termination networks, elevated air terminals, down conductor routes and earth termination arrangements.

Rooftop mechanical equipment was assessed to establish appropriate protection coverage, separation distances and bonding requirements.

Commercial Lightning Protection Installation

The combined installation programme incorporated:

  • Approximately 2,850 linear metres of lightning protection conductor

  • 64 air termination rods

  • 48 down conductor routes

  • 56 earth electrodes

  • 48 accessible test connections

  • Equipotential bonding connections

  • Coordinated surge protection devices

  • Dedicated conductor fixings and supports

Conductor materials and fixing systems were selected according to roof construction, environmental exposure and architectural requirements.

Electrical Surge Protection

Vertex Lightning Protection installed coordinated surge protection devices at selected electrical distribution points across the business campus.

The protection arrangements addressed transient overvoltages affecting building management systems, communications equipment, office electrical infrastructure and security installations.

Installation Around Commercial Occupancy

The installation programme was divided into five individual building phases.

Roof access, external excavation and electrical isolation were coordinated with facilities managers to minimise disruption to occupied office accommodation.

Testing and Commissioning

Each completed lightning protection system underwent visual inspections, electrical continuity testing and earth resistance measurements.

The customer received individual installation drawings, commissioning records and recommended future inspection schedules.

The Outcome

Heswall Commercial Property Developments received coordinated lightning protection arrangements across its five commercial office buildings.

The completed project delivered:

  • Lightning protection across 52,400m² of commercial accommodation

  • Five building-specific protection systems

  • Coordinated earthing and bonding infrastructure

  • Surge protection for selected electrical installations

  • Individual testing and commissioning records

  • Centralised system documentation

The installation programme was completed within twenty-eight working days and the agreed £118,750 budget.

Project Takeaway: Commercial lightning protection reduces exposure to structural and electrical damage because coordinated external protection, earthing and surge protection manage different lightning-related risks.

Lightning Protection Refurbishment Across Three Historic Churches in Somerset

Project: Historic church lightning protection refurbishment

Customer: Reverend Peter Aldwick

Organisation: Somerset Parish Buildings Partnership

Location: Wells, Frome and Glastonbury

Number of Churches: 3

Church Tower Heights: Between 24 and 38 metres

Project Value: £57,600

Project Duration: 24 working days

Services: Church lightning protection, system refurbishment, conductor replacement, earthing and testing

The Customer's Requirements

Somerset Parish Buildings Partnership managed three historic churches incorporating traditional stone construction, elevated bell towers, decorative masonry and stained glass windows.

Previous inspections identified deteriorated lightning protection conductors, damaged fixings and ageing earth termination arrangements.

The customer required refurbishment works that addressed the identified defects without compromising the historic appearance or architectural significance of the buildings.

Historic Building Lightning Protection Assessments

Vertex Lightning Protection inspected the existing protection systems across all three churches.

The assessment programme considered:

  • Church tower heights

  • Roof and spire construction

  • Historic masonry

  • Existing conductor routes

  • Condition of air termination components

  • Bell tower electrical installations

  • Earth electrode condition

  • Conservation requirements

Existing protection arrangements were reviewed against the relevant system design and applicable lightning protection requirements.

Heritage-Sensitive System Design

Replacement conductor routes followed existing architectural features wherever practicable.

The installation designs incorporated discreet conductor positioning and suitable fixing methods to minimise alterations to historic building materials.

Proposed works were coordinated with conservation representatives, with relevant permissions addressed before installation commenced.

Church Lightning Protection Refurbishment

The combined refurbishment programme incorporated:

  • Approximately 480 linear metres of copper conductor

  • 10 replacement air termination rods

  • 12 down conductor routes

  • 18 earth electrodes

  • 12 accessible test connections

  • Replacement conductor fixings

  • Renewed bonding connections

  • Selected surge protection upgrades

Suitable existing components were retained where their condition and performance could be established.

Specialist Access Arrangements

The installation teams used appropriate scaffolding and elevated access equipment to reach church towers and roof structures.

Work programmes were coordinated around religious services, weddings, funerals and community activities.

Temporary working areas protected visitors and members of the public during installation.

Earth Termination Improvements

Existing earth electrode arrangements were assessed before replacement or supplementary electrodes were installed.

New earth termination components were positioned according to the system design, available ground conditions and restrictions associated with historic church grounds.

Accessible test connections were provided to facilitate future inspections.

Testing and Inspection

Following refurbishment, each church received:

  • Visual lightning protection inspections

  • Electrical continuity testing

  • Earth resistance measurements

  • Bonding connection inspections

  • Updated system drawings

  • Individual inspection reports

The Outcome

Somerset Parish Buildings Partnership received refurbished lightning protection systems across all three historic churches.

The completed programme delivered:

  • Replacement of deteriorated lightning protection components

  • Renewed copper conductor networks

  • Improved earth termination arrangements

  • Discreet installation routes

  • Updated inspection and testing documentation

  • Protection measures appropriate to each historic building

The refurbishment programme was completed within twenty-four working days and the agreed £57,600 budget.

Project Takeaway: Historic church lightning protection requires building-specific installation methods because conservation restrictions and traditional construction materials influence conductor positioning, fixings and earth termination arrangements.

School Lightning Protection Installations Across Twelve Educational Sites in Yorkshire

Project: Multi-site school lightning protection installation and refurbishment

Customer: Alison Thackray

Organisation: Yorkshire Learning Estates Partnership

Location: Leeds, Bradford, Harrogate, Wakefield and York

Number of Schools: 12

Combined Building Floor Area: 58,200m²

Number of Pupils: Approximately 8,400

Project Value: £186,400

Project Duration: 35 working days

Services: School lightning protection, lightning risk assessments, system installations, refurbishment and testing

The Customer's Requirements

Yorkshire Learning Estates Partnership managed twelve primary and secondary schools incorporating teaching buildings, science laboratories, sports halls, administrative accommodation and specialist learning facilities.

Several schools had undergone extensions and roof refurbishments, requiring reviews of existing lightning protection arrangements.

Other schools required new protection systems following updated risk assessments.

The customer required a coordinated installation programme during the summer school holidays.

School Lightning Risk Assessments

Vertex Lightning Protection conducted individual lightning risk assessments across all twelve educational sites.

The assessments considered:

  • Building dimensions and occupancy

  • Existing lightning protection installations

  • School extensions and additional buildings

  • Roof construction

  • Electrical distribution systems

  • Information technology infrastructure

  • Rooftop mechanical equipment

  • Potential consequences of lightning-related damage

  • Existing earthing arrangements

The assessment programme identified five schools requiring new lightning protection systems and seven requiring upgrades or refurbishment.

School Lightning Protection Installation Programme

The combined installation programme incorporated:

  • Approximately 4,100 linear metres of lightning protection conductor

  • 86 air termination rods

  • 72 down conductor routes

  • 84 earth electrodes

  • 72 accessible test connections

  • Replacement conductor supports and fixings

  • Equipotential bonding connections

  • Coordinated surge protection installations

Individual protection arrangements reflected the requirements established through each school's risk assessment and system design.

Protection of School Electrical Infrastructure

Surge protection arrangements were assessed across the educational estate.

Selected installations incorporated coordinated protection measures for electrical distribution infrastructure serving computer suites, science laboratories, communications systems and interactive classroom equipment.

Summer Holiday Installation Scheduling

Vertex Lightning Protection deployed multiple installation teams across the twelve school sites.

The individual work programmes coordinated:

  • Roof-level conductor installations

  • Down conductor installation

  • Earth electrode installation

  • External excavation

  • Electrical distribution works

  • System inspection and testing

Installation activities were coordinated with school estates managers and other refurbishment contractors.

School Lightning Protection Testing

Following installation, each school received individual inspection and commissioning documentation covering:

  • Air termination system inspections

  • Down conductor continuity measurements

  • Earth resistance measurements

  • Bonding connection inspections

  • Installation drawings

  • Details of completed remedial works

  • Recommended inspection intervals

The Outcome

Yorkshire Learning Estates Partnership received upgraded lightning protection arrangements across twelve educational sites.

The completed programme delivered:

  • Twelve individual lightning risk assessments

  • Five new lightning protection installations

  • Seven existing system refurbishments

  • Upgraded earthing and bonding infrastructure

  • Individual school testing records

  • Centralised lightning protection documentation

  • Completion before pupils returned for the autumn term

The programme was completed within thirty-five working days and the agreed £186,400 budget.

Project Takeaway: Coordinated school lightning protection programmes support educational estates management because individual assessments establish building-specific requirements while centralised documentation simplifies future inspections and maintenance.

Industrial Lightning Protection Installation at an Automated Manufacturing Campus in Coventry

Project: Industrial lightning protection and earthing installation

Customer: Malcolm Sherratt

Company: Sherratt Advanced Manufacturing

Location: Coventry, West Midlands

Number of Industrial Buildings: 4

Combined Floor Area: 64,800m²

Project Value: £132,800

Project Duration: 30 working days

Services: Industrial lightning protection, risk assessments, earthing systems, surge protection and commissioning

The Customer's Requirements

Sherratt Advanced Manufacturing operated four industrial buildings incorporating automated production lines, robotic assembly equipment, precision manufacturing machinery and electrical control systems.

The manufacturing campus had undergone significant expansion, introducing additional production facilities and upgraded electrical infrastructure.

The customer required coordinated lightning protection arrangements across the expanded industrial estate to reduce exposure to equipment damage and production disruption.

Industrial Lightning Risk Assessments

Vertex Lightning Protection assessed each manufacturing building individually.

The assessment programme considered:

  • Industrial building dimensions

  • Structural steelwork

  • Roofing materials

  • Roof-mounted extraction and ventilation equipment

  • Electrical distribution infrastructure

  • Automated manufacturing equipment

  • Incoming power and communications services

  • Existing earthing and bonding arrangements

  • Potential production interruptions

The findings informed the lightning protection designs for each building.

Soil Resistivity Assessments

Soil resistivity measurements were undertaken at selected locations across the manufacturing campus.

The results supported the design of earth termination arrangements appropriate to the ground conditions and existing site infrastructure.

The earthing designs incorporated suitable electrode configurations, buried conductors and bonding connections.

Industrial Lightning Protection Installation

The combined installation programme incorporated:

  • Approximately 3,600 linear metres of roof-level conductors

  • 76 air termination rods

  • 58 down conductor routes

  • 68 earth electrodes

  • Approximately 1,120 linear metres of buried earthing conductor

  • 58 accessible test connections

  • Equipotential bonding connections

  • Coordinated surge protection devices

The installation designs accounted for rooftop extraction equipment, structural steelwork and existing electrical infrastructure.

Industrial Surge Protection Arrangements

Coordinated surge protection devices were installed at selected points within the electrical distribution infrastructure.

The protection measures addressed transient overvoltages affecting equipment supplied by the relevant distribution systems, including production controls, communications infrastructure and industrial machinery.

Device selection and installation reflected the electrical characteristics of each building.

Installation Around Production Schedules

The manufacturing campus remained operational throughout most of the installation programme.

Vertex Lightning Protection divided the works into individual building phases and coordinated electrical isolations with the customer's engineering team.

Selected works were completed during planned machinery maintenance periods.

System Testing and Commissioning

The completed installations underwent:

  • Visual inspections

  • Electrical continuity measurements

  • Earth resistance testing

  • Bonding connection verification

  • Inspection against the agreed installation designs

  • Surge protection installation checks

Individual commissioning records were produced for each manufacturing building.

The Outcome

Sherratt Advanced Manufacturing received coordinated lightning protection installations across its four industrial buildings.

The completed project delivered:

  • Lightning protection across 64,800m² of manufacturing accommodation

  • Building-specific air termination systems

  • Coordinated earth termination networks

  • Upgraded equipotential bonding arrangements

  • Surge protection for selected electrical installations

  • Individual testing and commissioning records

  • Centralised industrial protection documentation

The installation programme was completed within thirty working days and the agreed £132,800 budget.

Project Takeaway: Industrial lightning protection supports manufacturing continuity because coordinated external protection, earthing and surge protection reduce exposure to lightning-related structural and electrical damage.

Lightning Protection Risk Assessments and Testing Across Thirty-Two Public Sector Buildings

Project: Multi-site lightning protection inspection and risk assessment programme

Customer: Rebecca Millward

Organisation: South West Public Estates Partnership

Location: Bristol, Bath, Exeter, Taunton, Plymouth and Cheltenham

Number of Buildings: 32

Combined Floor Area: 146,800m²

Project Value: £28,800

Average Assessment and Inspection Cost: £900 per building

Project Duration: 30 working days

Services: Lightning risk assessments, lightning protection testing, system inspections and condition reporting

The Customer's Requirements

South West Public Estates Partnership managed a diverse property portfolio incorporating administrative offices, libraries, community buildings, leisure centres and public service facilities.

Existing lightning protection systems varied in condition, age and installation specification.

Several properties had undergone structural alterations since their previous assessments.

The customer required updated risk assessments and detailed inspections to establish ongoing protection requirements across the estate.

Public Sector Property Assessment Programme

Vertex Lightning Protection coordinated assessments across:

  • 12 administrative office buildings

  • 8 libraries

  • 6 community centres

  • 4 leisure centres

  • 2 public service facilities

Previous lightning protection reports, building drawings and maintenance records were reviewed wherever available.

Lightning Risk Assessment Programme

Individual risk assessments considered:

  • Building size and structural height

  • Geographical lightning exposure

  • Construction materials

  • Occupancy levels

  • Electrical and communications infrastructure

  • Potential interruption to public services

  • Existing lightning protection arrangements

  • Recent building alterations

The assessment findings established whether existing protection measures required further investigation or modification.

Lightning Protection System Inspections

The inspection programme examined existing:

  • Air termination networks

  • Down conductors

  • Conductor supports and fixings

  • Accessible test connections

  • Earth termination components

  • Equipotential bonding arrangements

  • Protection coverage around altered roof structures

Electrical continuity and earth resistance testing were completed at 416 accessible testing locations.

Inspection and Risk Assessment Findings

The completed programme established:

  • 21 buildings with no significant defects identified within the inspection scope

  • 8 buildings requiring minor repairs or maintenance

  • 3 buildings requiring more extensive remedial works or protection design reviews

The inspections identified:

  • 62 damaged or deteriorated conductor fixings

  • 24 corroded conductor connections

  • 14 defective test connections

  • 9 earth termination arrangements requiring further investigation

  • 6 rooftop alterations requiring reviews of lightning protection coverage

The findings were recorded within individual property reports.

Prioritised Maintenance Recommendations

Vertex Lightning Protection provided building-specific maintenance recommendations covering:

  • Replacement of damaged lightning conductors

  • Renewal of deteriorated connections

  • Replacement of defective fixings

  • Investigation of earth termination arrangements

  • Additional bonding measures where required

  • Protection design reviews following building alterations

Recommendations were prioritised to support the customer's maintenance budgeting and procurement arrangements.

Centralised Asset Reporting

A consolidated lightning protection register recorded each property's assessment date, system condition, identified defects and recommended maintenance requirements.

Individual risk assessment and inspection documents were supplied alongside the register.

The Outcome

South West Public Estates Partnership received updated lightning protection records across all thirty-two public sector buildings.

The completed programme delivered:

  • Thirty-two lightning risk assessment reviews

  • Thirty-two individual system inspections

  • Electrical testing across 416 accessible locations

  • Identification of eleven buildings requiring further works

  • Prioritised maintenance recommendations

  • Centralised lightning protection asset records

The assessment programme was completed within thirty working days and the agreed £28,800 budget.

Project Takeaway: Portfolio-wide lightning risk assessments and testing support preventative maintenance because coordinated inspection records identify deteriorated components, building alterations and protection requirements across individual properties.

Lightning Protection Maintenance Across Fourteen Hotels and Leisure Resorts

Project: Nationwide lightning protection maintenance and refurbishment programme

Customer: Edward Bradfield

Company: Bradfield Hotels and Leisure Resorts

Location: Manchester, Liverpool, Chester, Bath, Cardiff, Birmingham and London

Number of Properties: 14

Combined Building Floor Area: 88,600m²

Number of Guest Rooms: 2,240

Project Value: £79,800

Project Duration: 32 working days

Services: Lightning protection maintenance, conductor repairs, earthing refurbishment, system upgrades and retesting

The Customer's Requirements

Bradfield Hotels and Leisure Resorts operated fourteen hospitality properties incorporating guest accommodation, restaurants, conference facilities, swimming pools and leisure amenities.

Previous lightning protection inspections identified deteriorated conductors, damaged roof-level fixings and earthing components requiring further attention.

Several hotels had also received rooftop mechanical equipment upgrades that required reviews of existing lightning protection coverage.

The customer required a coordinated maintenance programme that minimised disruption to guests and hospitality operations.

Existing Lightning Protection Condition Assessments

Vertex Lightning Protection reviewed previous testing records and inspected the existing systems at each property.

The inspections identified:

  • Damaged roof-level conductors

  • Corroded conductor joints

  • Deteriorated air termination components

  • Loose or damaged conductor fixings

  • Defective test connections

  • Earth electrodes requiring replacement or investigation

  • Roof alterations requiring protection reviews

The findings informed the individual maintenance programmes.

Lightning Protection Maintenance and Remedial Works

The combined refurbishment programme incorporated:

  • Replacement of approximately 1,240 linear metres of lightning protection conductor

  • Replacement of 34 air termination rods

  • Refurbishment of 42 down conductor routes

  • Replacement of 560 conductor fixings

  • Renewal of 38 accessible test connections

  • Replacement or supplementary installation of 30 earth electrodes

  • Renewal of 86 conductor and bonding connections

Suitable existing components were retained where their condition and performance could be established.

Lightning Protection Reviews Following Mechanical Upgrades

Several properties had received replacement air conditioning equipment, ventilation systems and rooftop mechanical plant.

Vertex Lightning Protection reviewed the existing protection arrangements around the altered roof configurations.

Air termination coverage, separation distances and bonding requirements were assessed and updated where required by the revised protection designs.

Earthing System Refurbishment

Selected earth termination arrangements were investigated following the review of previous electrical testing records.

Replacement or supplementary electrodes were installed according to individual site requirements.

Accessible test connections were reinstated to facilitate subsequent inspections and maintenance.

Maintenance Around Hotel Occupancy

The maintenance teams coordinated activities with individual hotel managers.

External access equipment, roof works and ground-level excavations were arranged around guest occupancy, conference bookings and scheduled hospitality events.

Selected electrical works were completed during agreed maintenance windows.

Post-Maintenance Lightning Protection Testing

Following completion, refurbished systems underwent visual inspections, electrical continuity measurements and earth resistance testing.

The updated reports documented:

  • Replaced lightning protection components

  • Revised conductor routes

  • Earth termination improvements

  • Updated electrical measurements

  • Remaining maintenance requirements

  • Recommended future inspection intervals

A consolidated asset register supported ongoing lightning protection maintenance across the hotel portfolio.

The Outcome

Bradfield Hotels and Leisure Resorts received refurbished lightning protection arrangements across fourteen hospitality properties.

The completed programme delivered:

  • Maintenance across 88,600m² of hospitality accommodation

  • Replacement of damaged lightning protection conductors

  • Refurbished air termination and down conductor systems

  • Improved earth termination arrangements

  • Revised protection around selected rooftop mechanical equipment

  • Updated inspection and testing records

  • Centralised maintenance documentation

The maintenance programme was completed within thirty-two working days and the agreed £79,800 budget.

Project Takeaway: Lightning protection maintenance preserves the intended performance of existing systems because component replacement, electrical testing and design reviews address deterioration and changes to building infrastructure.

Contact Vertex Lightning Protection

Vertex Lightning Protection provides commercial lightning protection, school lightning protection, church lightning protection, industrial installations, lightning risk assessments, system testing, maintenance and refurbishment throughout the UK.

Our team delivers building-specific protection systems, coordinated earthing arrangements and comprehensive inspection documentation for individual buildings and nationwide property portfolios.

Contact us today to discuss your lightning protection installation, testing or maintenance requirements.

Get in Touch

We aim to get back to you in 1 working day.


Skip to

Privacy Information

Social Links

Contact

Vertex Lightning Protection
Trading style of Equiptest Limited
The Old Parlour
Latteridge
Bristol
BS37 9TS

Vertex Lightning Protection is a trading style of Equiptest Limited, registered in England & Wales (company no. 06009889).